Thank you for your patience while we retrieve your images.
Uploaded 28-Jan-17
19 of 154 photos

170128_0243_EOS M5 Construction of the New Tappan Zee Bridge at Dawn Seen from George's Island

The first bridge of this $3.9 billion 3 mile project will open in Summer 2017. The second bridge along side it will be completed in 2018 after the old bridge, behind it in the image, is taken down. The bridge is 8 miles down river from George's Island, brought closer by the long telephoto lens.
Canon EOS M5, f/5.6 @ 400 mm, 1/1600, ISO 1250, No Flash